Cedar Creek Wind Farm 230kV Transmission Line and Substation

Renewable-Energy-Cedar-Creek-Wind-Farm-03     Renewable-Energy-Cedar-Creek-Wind-Farm-02     Renewable-Energy-Cedar-Creek-Wind-Farm-01

Location: Colorado

Description: This Engineer-Procure-Construct (EPC) project was located in Colorado and consisted of 73 miles of new 230kV transmission line, installation of new 34.5/345kVcollector substation with two 60MVA transformers, 2 capacitor banks, collection circuits, switches, metering steel structures, grounding, control building and all related civil work. The contract also included the purchasing and management of $15 million in material. Transmission structures consisted of 455 hybrid H-frames comprised of concrete and steel, 36 dead-end structures and bundled 954 and (2) 3/8″ overhead ground wire. Project included helicopter work and was constructed in harsh winter conditions.

Completion Date: June 2007

Work Performed By:  Great Southwestern Construction, Inc., a subsidiary of MYR Group

Client: Cedar Creek Wind Energy