Wind – Juniper Canyon Wind Farm 345kV Transmission Line

Juniper-Wind-Farm-01      Juniper-Wind-Farm-02      Juniper-Wind-Farm-03

Location: Washington

Description: This project consisted of the construction of 20.4 miles of transmission line on wood H-frame structures and steel monopole dead ends. Helicopters were used to string conductor across canyons and rocky terrain. Extensive drilling was required to get through the tough terrain.

Completion Date: 2010

Work Performed By: Hawkeye Construction, a Sturgeon Electric company; a subsidiary of MYR Group

Client: Canyon Wind Power, LLC (Iberdrola Renewables)