Skywest Transmission Structure Replacements Energized
Skywest Transmission Structure Replacements |
|
|---|---|
| Client | Oncor |
| Completion Date | 2023 |
| Location | West Texas |
| Completed by | Great Southwestern Construction |
Great Southwestern Construction removed 10 miles of existing concrete delta configured 138kV wooden poles, installed new double-circuit steel poles, and installed new circuit, all while the existing circuit was energized.